TM 11-6625-2709-12
CHAPTER 2
OPERATION
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
2-1. Unpacking.
(5) Remove the aid box from its storage com-
partment in the lid of the carrying case.
a. Packaging Data. All components of the test
(6) Open the storage compartment lid and
set are contained in the carrying case. When packed
for shipment, the air vent on the carrying case is
take the pendant cables from their storage com-
partment.
opened. The carrying case is placed on four
polystyrene corner blocks that are in the four bot-
2-2. Checking Unpacked Equipment.
tom corners of a triple-wall fiberboard box. Four
more corner blocks are then placed on the top four
a. Inspect the equipment for damage incurred
corners of the carrying case. The box is then closed
during shipment. If the equipment has been damag-
and taped shut. The box is 25 x 22 x 18 inches, the
corner blocks are 6 x 6 x 6 inches with cutouts 4 x 4
x 4 inches. The total weight of the box is 43 pounds,
b. Check the equipment against the packing list.
and the volume is 5.7 cubic feet. .4 typical shipping
If no packing list accompanies the equipment, check
the equipment against the list of equipment
supplied (para 1-6) and report any overages or shor-
b. Removing Contents.
(1) Use a knife to cut the tape on the box.
c. If the equipment has been used or recon-
Open the four flaps.
ditioned, see whether it has been changed by a
modification work order (MWO). If modified, an
(2) Remove the four corner blocks from the
MWO number will appear on the iront panel near
top of the carrying case. Remove the carrying case
the nomenclature plate. Check to see whether the
from the box.
MWO number and the appropriate notations con-
cerning the modification have been entered in this
(3) Disengage the two twist-lock clamps and
manual.
open the carrying case.
(4) Remove the technical manual from the lid
Note: Current MWO's applicable to the equipment are listed
of the carrying case.
in DA Pam 310-4.
2-1