TM 11-6625-622-40
control settings
Step
.
Performance standard
No.
Test equipment
Equipment under test
Test procedure
From
To
W5-p
J1-31
W6-U
J1-59
W6-Z
J1-30
W6-a
J1-58
W5-b
J1-57
W5-f
J6-B
W6-g
J6-C
W6-h
J6-D
W6-Y
J6-F
W5-W
J6-Z
J1-7
J6-A
J6-K
J1-26
J1-55
J6-N, P, and R
W5-q
J6-N, P, and R
J6-S, T, U, and
J1-11
V
J6-X
J1-5
J6-i
J1-9
J1-10
J6-k
J1-56
J6-r, s, and t
J1-18
Ground
J1-27
Ground
J1-60
J2-60
J7-C
J1-12
J1-18, 1, 2, 14, 8,
J4-C
15, 16, and 4
Connect test leads of ME-
2 Same as step 1 ..- a. KEY switch: up.
ME-26B/U must indicate
b. KEY switch: down.
26 B/U to following point:
positions of KEY switch.
To
W5-m
GRD
3 Same as step 1 ---
Connect test leads to ME-
TUNE POWER switch :
MS-26B/U must indicate
26 B/U to following point:
down.
zero resistance.
From
To
GRD
J1-10
4 Same as step 1 --- a. CW KEY switch:
Connect teat leads of ME-
ME-26B/U must indicate
26B/U to following point:
b. CW KEY switch:
positions of CW key
From
To
down.
W5-K
Ground
switch.
5 Same as step 1 --- KEY INTLK switch:
Connect test leads of ME-
ME-26B/U must indicate
BY PASS.
26B/U to following point:
resistance.
From
To
J1-5
J1-56
6
Same as step 1 ---
714E-1--714E-2/8 switch
Connect test leads of ME-
MS-26B/U must indicate
S6 : 714S-2/8.
26 B/U to following points:
zero resistance for all
points listed in this step.
From
To
J1-24
W5-i
J1-26
W5-V
J1-69
W5-U
J1-55
W5-q
7 a. FUNCTION
TUNE POWER switch :
Connect test leads of ME-
ME-26B/U must indicate in-
switch :
normal.
26 B/U to following point:
finite resistance.
OHMS.
From
To
b. RANGE
Ground
J1-10
switch :
RXIM.
8 Same as step 7 --- KEY switch: center.
Connect test leads of ME-
ME-26 B/U must indicate
26 B/U to following point:
infinite resistance.
From
To
J1-55
Ground
3-10