5-19. Direct Support Testing
5-18. Physical Inspection
through 5-10.
Table 5-5 is a
physical inspection chart for the
test set
Table 5-5. Physical
Inspection Chart for Test Set Group
Performance standard
Test procedure
Item to be Inspected
a. No damage evident
a. Inspect cases of
Interconnecting Box,
or parts missing. Ex-
Air Cooler, Indicator
all components for
ternal surfaces in-
Attenuator, Headset
damage, missing
tended to be painted
parts, and condition
Adapter, and Cable
do not show metal.
Assemblies
of paint.
NOTE
legible.
Touchup painting is recom-
mended in place of refinish-
ing whenever practicable.
b. Screws, nuts, and
b. Inspect all con-
bolts are tight; none
trols for loose or
are missing.
missing screws,
bolts, and nuts.
c. Inspect all con-
c. No looseness or
nectors, jacks, and
damage is evident.
test points for loose-
ness or damage.
d. Operate all
d. Switches operate
switches
properly.