Section V. FOURTH ECHELON TESTING PROCEDURES
44. General
Equipment under test control settings
columns; then perform each specific test
a. Testing procedures are prepared for
procedure and verify it against its per-
use by Signal Field Maintenance Shops and
formance standard.
Signal Service Organizations responsible
for fourth echelon maintenance of signal
equipment to determine the acceptability
45. Test Equipment, Tools, Materials, and
of repaired signal equipment. These pro-
Other Equipment Required
cedures set forth specific requirements
All test equipment, tools, materials, and
that repaired signal equipment must meet
other equipment required to perform the
before it is returned to the using orgauza-
testing procedures given in this section
t i o n . A summary of the performance
are listed in the following chart and are
authorized under TA 11-17, Signal Field
b. Comply with the instructions preced-
Maintenance Shops, and TA 11-100 (11-17),
ing each chart before proceeding to the
Allowances of Signal Corps Expendable
chart. Perform each test in sequence. DO
Supplies for Signal Field Maintenance
not vary the sequence. For e a c h step,
Shop, Continental United States.
per for m all the actions required in
the Test equipment contro1 settings and
a. Test Equipment.
37