TM 11-6625-2709-40
GENERAL SUPPORT TESTING PROCEDURES
b. Comply with the instructions preceding the
body of each chart before proceeding to the chart.
a. Testing procedures are prepared for use by
Perform each test in sequence. Do not vary the se-
general support and depot maintenance shops
quence. For each step, perform all the actions re-
responsible for general support and depot
quired in the Control settings column; then perform
maintenance of electronic equipment to determine
each specific test procedure, and verify it against its
the acceptability of repaired electronic equipment.
performance standard.
These procedures set forth specific requirements that
4-2. Test Equipment, Tools, and Materials.
repaired electronic equipment must meet before it is
r e t u r n e d to the using organization. The testing
All test equipment, tools, materials, and other
procedures are to be used for both general support
equipment required to perform the testing
procedures given in this section are listed in the
testing procedures and depot overhaul standards.
Applicable procedures of the Army depots perfor-
following charts and are authorized under TA-11-17,
m i n g these tests and the general standards for
Signal Field Maintenance Shops, and TA-11-100(11-
repaired electronic equipment given in TB SIG 355-1,
17), Allowances of Signal Corps Expendable Supplies
TB SIG 355-2, and TB SIG 355-3 form a part of the
for Field Maintenance Shop, Continental United
requirements for testing this equipment.
States.
TM 11-6625-588-15
TM 11-5017
TM 11-6625-320-12
TM 11-6625-200-12
TM 11-6625-492-12
TM 11-6625-535-15
TM 11-25535B
1
b. Tools. All tools required are contained in Elec-
(3) Wire, copper, insulated, stranded #22 AWG
tronic Eqllipment Tool Kit TK-105/G, Federal stock
(40 feet long).
number 5180-610-8177.
( 4 ) Connectors (three), Bendix PT01A-20-
C.
Materials.
40P(SR).
(5) Connector, Bendix PT01A-20-40P(SR).
(1) 1/4-inch barrel diameter.
(6) Clamp MS3057-10A.
(2) Telephone plug (1/4-inch diameter barrel).