TM 11-6625-820-45
CHAPTER 4
GENERAL SUPPORT TESTING PROCEDURES AND DEPOT
OVERHAUL STANDARDS
4-1. General
b. Comply with the instructions preceding
the body of each chart before proceding to the
a. Testing procedures are prepared for use
chart. Perform each test in sequence. Do not
b y general support and depot maintenance
vary the sequence. For each step, perform all
shops responsible for general support and
the actions required in the Control settings
depot maintenance of electronic equipment to
columns; then perform each specific test pro-
determine the acceptability of repaired elec-
cedure, and verify it against its performance
tronic equipment. These procedures set forth
standard.
specific requirements that repaired electronic
equipment must meet before it is returned to
the using organization. The testing procedures
4-2. Test Equipment, Tools, and Materials
are to be used for both general support testing
procedures and depot overhaul standards. Ap-
All test equipment, tools, materials, and oth-
plicable procedures of the Army depots per-
er equipment required to perform the testing
forming these tests and the general standards
procedures given in this section are listed in
for repaired electronic equipment given in TB
the following charts and are authorized under
TA1117, Signal Field Maintenance Shops,
SIG 355-1, TB SIG 355-2, and TB SIG 355-3
and TA11100(1117), Allowances of Signal
form a part of the requirements for testing
Corps Expendable Supplies for Field Mainte-
this equipment. A summary of the perform-
nance Shop, Continental United States.
Nomenclature
Federal stock number
Technical
manual
Modulator MD-83A/ARN
6625-539-8563
TM 11-6625-588-15
6625244-0501
Output Meter TS585(*)/
TM 11-5017
U
6625-669-0742
TM 11-6625-320-12
Electronic ME-30(*)/
U
6625-542-6407
TM 11-6625-200-12
6625-086-7844
TM 11-6625-492-12
AN/ASM-101
6625-987-6603
TM 11-6625-535-15
140A
Meter Test Set TS682A/
6625-669-0747
TM 11-2535B
GSM-1
4-1